首页> 外文会议>Geosynthetics in Civil and Environmental Engineering >FLUME EXPERIMENT AND NUMERICAL ANALYSIS FOR BANK REINFORCEMENT WITH GEOCONTAINER
【24h】

FLUME EXPERIMENT AND NUMERICAL ANALYSIS FOR BANK REINFORCEMENT WITH GEOCONTAINER

机译:土工容器加筋的烟气实验及数值分析。

获取原文
获取原文并翻译 | 示例

摘要

In China, dumped riprap is used for emergency elimination of bank collapse in large rivers. However,the riprap collapses due to washing and scouring in flood period. Geocontainer is applied to sustain river bank stable for a long time. In order to use geocontainer for practical emergency elimination of bank collapse, model experiment and numerical analysis about geocontainer are performed. The geometrical scale of model is 1:60. The formulae of sinking trace of the geocontainer have been deduced according to test data and it can be used to guide construction. The analysis software FLAC3D is used to analyze the stability effect of the geocontainer sustaining river bank under four water levels at Mahu dike in Yangtze river which collapsed in 1996. The result shows that the bank loses its stability under the fourth condition without sustained geocontainers and the bank stability can be kept with sustained geocontainers under the same condition.
机译:在中国,倾倒的翻录垃圾被用于紧急消除大河中的河岸倒塌。然而,由于洪水时期的洗涤和冲刷,riprap倒塌了。 Geocontainer用于长时间维持河岸稳定。为了利用土工容器实际应急消除堤岸塌陷,进行了有关土工容器的模型试验和数值分析。模型的几何比例为1:60。根据试验数据推导了土工容器的下沉轨迹公式,可用于指导施工。分析软件FLAC3D用于分析1996年塌陷的长江玛湖堤防在4个水位下的土工容器维持河岸的稳定性效果。结果表明,在没有持续的土工容器的情况下,该堤在第四种条件下失去了稳定性。在相同条件下,可持续的土工容器可以保持堤岸的稳定性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号