Research on Design Technology of Road Tunnel under Airport Taxiway in Soft Ground

机译:软土地基机场滑行道下公路隧道设计技术研究

获取原文
获取原文并翻译 | 示例

摘要

A road tunnel with 669m long has been built under the airport taxiway in Shanghai Pudong International Airport. With the effect of the additional loads including airplane, the tunnel project is mainly related to the uneven settlement between the tunnel structure and soft ground at its two sides, which is caused by the settlement of the deep soft soil. In this study, a reasonable design technical program had been brought forward. Moreover, considering the uneven settlement between the tunnel structure and soft ground at its two sides, soil-cement pile was adopted to improve the foundation of the tunnel at the sides and the bottom. At last, a prediction study on settlement and an analysis of the survey in-situ were carried out in the road tunnel and the foundation surrounding, and these two results are approximate. The result of this study provides the scientific and feasible basis of design for the construction of road tunnels under the airport taxiways in soft ground.
机译:上海浦东国际机场的机场滑行道下已修建一条长669m的公路隧道。在包括飞机在内的附加载荷的作用下,隧道工程主要与隧道结构与两侧软土地基之间的沉降不均匀有关,这是由于深层软土沉降造成的。在这项研究中,提出了合理的设计技术方案。此外,考虑到隧道结构与两侧软土地基之间的沉降不均匀,采用了水泥土桩来改善隧道两侧和底部的地基。最后,对公路隧道及地基周围环境中的沉降量进行了预测研究并进行了实地分析,这两个结果是近似的。研究结果为软土地基机场滑行道下公路隧道的施工设计提供了科学可行的依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号