An Osaka floating swing arch bridge towed to the site from dockyard

机译:大阪浮桥从船坞拖至现场

获取原文
获取原文并翻译 | 示例

摘要

The world's first swing and floating arch bridge was towed for 10km in 3 hours to the construction site from the dockyard after the erection of 2 years and 5 months. The floating bridge was further cautiously moved very close to the dolphins with the reaction wall kept in the flat position. The bridge was connected by inserting the vertical pin at a reaction wall on one of the dolphins that are fixed to the seabed by piles. Then, the vertical walls were raised and rotated to take the upright position at both ends. The transition girders were then connected to the floating part. At both ends of the floating bridge, it is held still through the clamping walls and fenders at the dolphins. The maximum speed was kept to be 4 knot during the towing operation but was down to 1.6 knot once in a while due to wild current.
机译:架设2年零5个月后,世界上第一座摆动和浮拱桥在3个小时内从船坞拖至施工现场10公里。进一步小心地将浮桥移动到非常靠近海豚的位置,并使反应壁保持在平坦的位置。通过将垂直销钉插入通过桩固定在海底的一只海豚上的反应壁上,从而连接桥。然后,将垂直壁抬起并旋转以使其两端处于直立位置。然后将过渡梁连接到浮动部分。在浮桥的两端,它通过夹持壁和海豚的挡泥板保持静止。在拖曳过程中,最大速度保持为4节,但由于野外电流,偶尔会降至1.6节。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号