Rolled Compacted Concrete dams: current construction methods, output and permeabilities

机译:碾压混凝土大坝:目前的施工方法,产量和渗透率

获取原文
获取原文并翻译 | 示例

摘要

This paper reviews the different current approaches on the construction of this type of dam, classifying them into two different groups: the ones that isolate the structural function from that of impermeability, and the ones that assign both functions to the same material. Among the first ones, the use of geomem-branes is the most prevalent solution. Among the second ones, the crucial point and most disputed topic is the maximum delay for covering one layer with the next. For some, this period is at the beginning of setting. Others, more lenient, accept longer periods. Examples of combined approaches are also analysed. This paper includes numerous data relating to the performance and behaviour of the different methods resulting from many executions, assessed from the viewpoint of achieved permeability.
机译:本文回顾了目前建造此类大坝的不同方法,将它们分为两个不同的组:将结构功能与抗渗性隔离开来的方法,以及将两种功能分配给相同材料的方法。在最初的方法中,使用几何记忆膜是最流行的解决方案。在第二个问题中,关键点和最有争议的话题是覆盖下一层的最大延迟。对于某些人来说,此时间段是设置的开始。其他人则宽大一些,接受更长的时间。还分析了组合方法的示例。本文从获得的渗透性的角度评估了许多数据,这些数据涉及因多次执行而产生的不同方法的性能和行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号