Phase Ⅲ Rolled Compacted Concrete Cofferdam Construction

机译:Ⅲ期轧制压实混凝土围堰施工

获取原文
获取原文并翻译 | 示例
       

摘要

Phase Ⅲ Rolled Compacted Concrete(RCC) cofferdam construction belongs to Phase Ⅲ diversion works. It is a key item to ensure an achievement in the reservoir impoundment, navigation and power generation in 2003 and a guarantee to the safety construction of the follow up right bank intake dam section and the powerhouse. Restrained by conditions for construction, navigation, the worksite and the duration, both the concreting intensity and the height of Phase Ⅲ RCC cofferdam exceed the current construction level. In view of these difficulties, a great deal of research work performed by relevant departments is described in the paper.