AN INITIAL EVALUATION OF DUBLIN PORT TUNNEL AND THE HGVMANAGEMENT STRATEGY FOR THE CITY

机译:都柏林港口隧道的初步评价和城市的HGV管理战略。

获取原文
获取原文并翻译 | 示例

摘要

On December 20th 2006, Dublin Port Tunnel was officially opened as arndedicated route for Heavy Goods Vehicles between Dublin Port (located in thernheart of the city) and the greater road network. It is part of the M50 motorwayrnand completes the northern part of the C-Ring around Dublin city. Prior to thernconstruction of the tunnel, all port-bound traffic was forced to travel throughrnthe city centre. The completed infrastructure now ensures that heavy goodsrntraffic can be removed to a large extent from the streets of the city centre. ThernTunnel is toll-free for Heavy Goods Vehicles and coaches over 25 seats. Allrnother vehicles are charged between 3 and 12 euro depending on the time ofrnday.rnIn order to encourage maximum use of the Port Tunnel by port related traffic,rnand to enhance the city centre environment, Dublin City Council hasrnintroduced a Heavy Goods Vehicle Strategy. This strategy prohibits vehiclesrnwith five or more axles from entering the city cordon area between 07:00 andrn19:00 daily. Any 5 or 5+ axle vehicle seeking to enter the city cordon betweenrnthese hours must apply for a permit. Permits cost 5 euro per day for eachrnvehicle entering the cordon and allow drivers to make five stops to deliver orrnpick up goods. Premises receiving deliveries using vehicles with five or morernaxles must register with Dublin City Council. The premises are obliged tornsubmit mitigation plans to show how they intend to reduce the number ofrndeliveries using five axles HGVs.rnThis paper provides a description of the Port Tunnel and the complementaryrnHGV Management Strategy. The impacts to date in terms of traffic and thernenvironment for Dublin City are outlined. Furthermore, the future direction ofrnthe HGV Management Strategy for Dublin is assessed.
机译:2006年12月20日,都柏林港口隧道正式开通,作为重型货车在都柏林港口(位于城市的中心)和更大的道路网络之间的固定路线。它是M50高速公路的一部分,完善了都柏林市周围的C形环的北部。在修建隧道之前,所有驶入港口的交通都被迫穿越市中心。现在,完工的基础设施可确保能够从市中心的街道上很大程度上清除重物运输。 ThernTunnel对于25座以上的重型货车和旅游车是免费的。其他车辆的收费标准在3到12欧元之间,具体取决于当天的时间。为了鼓励港口相关交通最大限度地使用港口隧道,并改善市中心环境,都柏林市议会制定了《重型货车战略》。此策略禁止在每天的07:00至19:00之间,带有五个或更多车轴的车辆进入城市警戒线区域。在这两个小时之间试图进入城市警戒线的任何5轴或5轴以上的车辆必须申请许可证。进入警戒线的每辆车每天的许可证费用为5欧元,并允许驾驶员停五站来运送提货货物。使用具有五个或更多轴的车辆接收交付的房屋必须向都柏林市议会登记。房舍有义务提交减损缓解计划,以显示他们打算如何减少使用五轴HGV的交付量。本文对港口隧道和互补的HGV管理策略进行了描述。概述了迄今为止对都柏林市交通和环境的影响。此外,还评估了都柏林HGV管理策略的未来方向。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号