首页> 外文会议>European Conference on Safety and Reliability (ESREL 2001); Sep 16-20, 2001; Torino, Italy >A methodology for estimating the influence of the human factor in riskanalysis
【24h】

A methodology for estimating the influence of the human factor in riskanalysis

机译:评估人为因素在风险分析中的影响的方法

获取原文
获取原文并翻译 | 示例

摘要

Industrial Organisation can be defined as the co-ordination of different activitiesrncarried out from single collaborators in order to establish planned relationships with externalrnand internal environment. A co-ordination has place if adequate mechanisms ofrncommunication and exercise of the decisional power exist. A best way in organisationrnplanning doesn’t exist, rather the organisations must be adapted from time to time to therncommon objectives and the individual human aims. Neglecting the influence of the humanrnerror in risk analysis, can lead to a sub estimate in top event valuation. In this paper wernintroduce a methodology for estimating the influence of the human factor in risk analysis.
机译:产业组织可以定义为由单个合作者进行的各种活动的协调,以便与外部和内部环境建立计划的关系。如果存在适当的沟通和行使决定权的机制,就可以进行协调。没有一种最佳的组织规划方式,而是必须不时地使组织适应共同的目标和个人的目标。在风险分析中忽略人为错误的影响,可能导致对顶级事件评估的次级估计。在本文中,我们介绍了一种评估人为因素在风险分析中的影响的方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号