Overnight Delivery-The Story of NJDOT's US Rt.1 Freeway Bridge Reconstruction Project

机译:隔夜送达-NJDOT美国Rt.1高速公路桥梁重建项目的故事

获取原文
获取原文并翻译 | 示例

摘要

The aging highway bridge infrastructure in the United States is being subjected to increasing traffic volumes, structural deficiency and functional obsolete. They must be continuously renewed while accommodating traffic flow. This presentation demonstrates the application of prefab technology where traffic control issues demanded rapid construction and decision making risk of total facility showdown. It shows an example supporting the FHWA's Accelerated Bridge Construction Decision Making Framework. Using the lessons learned from previous experience with the emergency repair/replacement, the reconstruction involved completely replacing three superstructures of two bridges with prefabricated components installed in 59-hour time window over a weekend structurally deficient bridges carrying a freeway section of Route US Rt.l through the capital city of Trenton. The project involved completely replacing the superstructures of the two bridges with new ones designed for a 75 year life made off site and installed over three weekend shutdowns of 59 hours each. The design and construction learned lessons from the past experience of two emergency repair/replacement projects. A project of this magnitude would typically take the Department approximately 2 years to design and construct as a traditional deck replacement and bridge rehabilitation project. The project approach saved more than 22 months and an estimated design and construction savings, including delay-related user costs in excess of $2M. The results? An extremely happy motoring public, bridge owner and contractor.
机译:在美国,老化的公路桥梁基础设施正面临日益增长的交通量,结构缺陷和功能过时的问题。在适应交通流量的同时,必须不断对其进行更新。本演示演示了预制技术的应用,其中交通控制问题需要快速建造,并且需要对整个设施进行摊牌的决策风险。它显示了支持FHWA的“加速桥梁建设决策框架”的示例。利用从先前的紧急维修/更换经验中吸取的经验教训,重建工作包括在59个小时的时间窗内将预制桥梁部件完全替换为两座桥梁的三个上部结构,该预制构件在周末承载了美国公路Rt.l的高速公路上结构缺陷的桥梁穿越首都特伦顿。该项目涉及在场外使用专为75年使用寿命而设计的新桥梁完全替换两座桥梁的上部结构,并在三个周末(每个59个小时)关闭后进行安装。设计和施工从两个紧急维修/更换项目的过去经验中吸取了教训。如此规模的项目通常需要国防部大约2年的时间来设计和建造,作为传统的甲板更换和桥梁修复项目。该项目方法节省了超过22个月的时间,并且估计节省了设计和施工成本,其中包括与延迟相关的用户成本超过200万美元。结果?非常高兴的驾车大众,桥梁所有者和承包商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号