Panama Canal expansion project - design and construction of lock complexes

机译:巴拿马运河扩建项目-船闸综合体的设计和建造

获取原文
获取原文并翻译 | 示例

摘要

The third set of lock complexes (one complex at Atlantic site, the other one at Pacific site), wererndesigned to permit Post-Panamax vessels to transit from ocean level to 27m higher Gatun level vicernversa.rnGoverning hydraulic design criteria was to reduce lockage time making usage of water savingrnbasins. Structural design was carried out taking into account usual, unusual and extreme loadrnconditions.rnConstruction of both complexes is still going on, and, in order to fulfill construction site schedule,rn10 to 15 lifts of a daily concrete volume between 3.000 and 5.000~m3 are poured at each site forrnconcreting independent reinforced monoliths.
机译:第三套船闸系统(一个在大西洋现场,另一个在太平洋现场)被设计成允许巴拿马型船从海平面上升到Gatun高27m,反之亦然。水力设计标准是为了减少锁定时间节水盆地的使用。考虑到通常,异常和极端的负载条件,进行了结构设计。rn这两个建筑群的建设仍在进行中,为了满足施工现场的进度,每天有3至10台升降机,每天的混凝土体积在3.000至5.000〜m3之间。在每个位置浇筑混凝土,以浇筑独立的增强整体结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号