Hong Kong-Zhuhai-Macao Bridge, Hong Kong Special Administrative Region (HKSAR): Design and construction of 9km of precast segmental twin deck bridges

机译:香港特别行政区(香港特别行政区)港珠澳大桥:9公里的预制分段双层桥的设计与施工

获取原文
获取原文并翻译 | 示例

摘要

The Hong Kong-Zhuhai-Macao Bridge is a 9 km long dual 3-lane road viaduct, which is the HongrnKong part of a 30km long fixed link from Hong Kong to Macao and Zhuhai. This project had beenrnawarded by Highway Department of Hong Kong to a Joint Venture formed by Dragages HongrnKong, China Harbour Engineering Company and VSL Hong Kong in 2012 as a design/build typerncontract. The work is presently ongoing and is scheduled to be completed by 2016.rnThe viaduct provides the link from the Scenic Hill next to Hong Kong's International Airport onrnChek Lap Kok Island to HKSAR's border with China in the Pearl River Delta.rnThis presentation focuses on the design and construction aspects of the viaduct, whose entire deckrnis made up of precast segments to cope with high durability requirements, the offshore nature of thernproject and a tight construction schedule.
机译:港珠澳大桥是一条长9公里的双三车道高架桥,是香港到澳门和珠海30公里长的固定线路中的HongrnKong部分。该项目已由香港路政署批准为德拉吉斯·洪恩孔,中国港湾工程公司和VSL香港于2012年成立的合资企业,作为设计/建造类型合同。该工程目前正在进行中,计划于2016年完成。高架桥提供了从香港国际机场旁的风景名胜山(赤Che角岛)到香港特区与珠江三角洲的边界的链接.rn本演讲着重于设计高架桥的施工方面,其整个甲板由预制段组成,以应对高耐久性要求,项目的海上性质和紧张的施工进度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号