【24h】

COMMISSIONING FOR OPTIMUM BUILDING PERFORMANCE

机译:调试以获得最佳的建筑性能

获取原文
获取原文并翻译 | 示例

摘要

This paper reviews the commissioning quality assurancernprocess as it is applied to a building’s main energyrnconsuming equipment - the HVAC system. Reducedrnenergy bills start with accurate system operation, which isrna result of planning, goal-setting, clear and completerndesign and field testing after installation. All of thesernactivities are part of the integrated commissioningrnprocess.rnExamples of commissioning results for air handling units,rnair conditioning machines, variable frequency drives,rnmodular boilers and HVAC controls are included in thisrnpaper. These results, recorded from commissioning jobsrnin commercial and institutional projects, show thernimprovements possible when the commissioning processrnis correctly planned and executed.
机译:本文回顾了将调试质量保证过程应用于建筑物的主要能耗设备HVAC系统的过程。降低的能源费用从准确的系统操作开始,这是计划,目标设定,清晰完整的设计以及安装后现场测试的结果。所有这些活动都是集成调试过程的一部分。本文包括空气处理机组,空调机,变频驱动器,模块化锅炉和HVAC控制装置的调试结果示例。这些结果是从商业和机构项目中的调试工作中记录下来的,这些结果表明,在正确地计划和执行调试过程时,可能会进行改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号