首页> 外文会议>Eleventh International Conference amp; Exhibition on Liquefied Natural Gas Birmingham, United Kingdom 3-6 July 1995 >Plant reliability analysis in lng plants analyse de fiabilite pour les usines de gnl
【24h】

Plant reliability analysis in lng plants analyse de fiabilite pour les usines de gnl

机译:Lng工厂的工厂可靠性分析Lng工厂的可靠性分析

获取原文
获取原文并翻译 | 示例

摘要

To realize the savings in capital and operating cost obtainable from new configurations and larger capacity LNG plants, it is necessary to maintain the high reliability and availability of the existing plant operation. For larger capacity plants it is of paramount importance to properly select the equipment type and configuration, i.e., large capacity drivers/compressors in series or smaller ones in parallel, two trains vs. three trains plants, interconnection between trains, etc. required to minimize lost production. Similarly, careful consideration has to be given to the use of spare equipment/instrumentation to minimize capital cost while maintaining high operating levels.
机译:为了节省可从新配置和更大容量的LNG工厂获得的资本和运营成本的节省,必须保持现有工厂运营的高可靠性和可用性。对于大容量工厂,正确选择设备类型和配置至关重要,例如,串联的大容量驱动器/压缩机或并联的较小型驱动器/压缩机,两列火车与三列火车的工厂,列之间的互连等,以尽量减少这种情况。生产损失。同样,必须谨慎考虑使用备用设备/仪器,以最大程度地降低资金成本,同时保持较高的运行水平。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号