【24h】

Preventive Measures Against Snow for High-Speed Train Operation in Japan

机译:日本高速列车的防雪措施

获取原文
获取原文并翻译 | 示例

摘要

Since bullet train operation started between Tokyo and Shin-Osaka (the Tokaido Shinkansen line) in 1964, Shinkansen trains have been damaged by snow while running at high speed every winter. Although water has been sprinkled over the track and speed control has been implemented to prevent snow on the track from flying up when trains run, these measures have not been completely. In this study, we reproduced a snow-flying phenomenon by implementing model tests to investigate the relationship between the density and water content of the snow cover. Appropriate speed limits were proposed based on the test results. It is planned to construct a Shinkansen network throughout Japan. In the present constrained economic situation, it is necessary for Shinkansen lines to be extended to snowy areas to reduce the costs of construction and snow control measures. Aiming at the reduction of running cost for snow control measures, we designed a viaduct for the Hokuriku Shinkansen line that is planned in Hokuriku region, one of the most snowy areas in Japan. In this paper, we describe the concept of the viaduct and demonstrate its effectiveness as a measure against snow through tests with a full-scale mockup and a motorcar rotary.
机译:自1964年东京和新大阪(东海道新干线)之间开动子弹头列车以来,新干线列车每年冬天都在高速行驶时被雪损坏。尽管在轨道上洒了水,并且已经实施了速度控制以防止火车行驶时轨道上的积雪飞扬,但是这些措施尚未完全解决。在这项研究中,我们通过执行模型测试来研究积雪的密度与含水量之间的关系,从而再现了飞雪现象。根据测试结果提出了适当的速度限制。计划在日本各地建设新干线网络。在当前经济不景气的情况下,有必要将新干线延伸至多雪地区,以减少建筑和防雪措施的成本。为了减少防雪措施的运行成本,我们为北陆新干线设计了一个高架桥,该高架桥计划在日本北雪地区之一的北陆地区进行。在本文中,我们描述了高架桥的概念,并通过全面模型和汽车旋转装置的测试证明了其作为防雪措施的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号