Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)

机译:运营西北“北矿”的挑战和经验教训(西澳大利亚州库尔贾鲁矿)

获取原文
获取原文并翻译 | 示例

摘要

The Cooljarloo North Mine has been shaped not only by operational and processing challenges, butrnby climatic and economic factors. This paper outlines some of these challenges and discusses how thernoperating strategy has been altered over time to mitigate the impacts.rnSince commissioning the wet concentrator in 1999, there have been many typical operationalrnchallenges to maximising valuable heavy mineral (VHM) recovery. These include: varying in pit feedrngrades, different slimes types and volumes, sizing extremes between VHM and trash minerals andrndecreased equipment reliability handling rocky ore. These issues were successfully mitigated by:rn1.in pit extraction strategies,rn2.upgrade of the de-sliming circuit,rn3.thickener modifi cations and fl occulent changes,rn4.installing upgraded and additional spiral capacity, andrn5.various Feed Preparation Plant screening initiatives.rnCombined with the ingenuity, persistence and patience of the operating team, VHM recoveryrn>95 per cent has been achieved.rnHowever, typical processing challenges have not been the only hurdles. Reduced rainfall and waterrnavailability has necessitated the strategic co-disposal of tailings and slime to increase the speed ofrnwater recovery: groundwater abstraction and water storage strategies have also been altered. Withrnan observed reduction in the speed and magnitude of groundwater recharge, overburden backfi llrnscheduling has become a priority mine planning function.rnCombined with the above challenges, the prevailing foreign exchange rate and mineral productrnprices have impacted profi tability. At the height of the Global Financial Crisis in 2009, major changesrnto the operating strategy were made to maintain a viable dry mining operation in 2010. Working withrnthe mining contractor the existing scraper and semi-fi xed Feed Preparation Plant set up was replacedrnwith a movable in pit dozer trap facility. The end result of changes to the mining method and primaryrnscreening was a ten per cent reduction in unit costs.rnThis article will elaborate on some of the above mentioned challenges and successes achieved overrnthe past ten years of operating the Cooljarloo North Mine.
机译:Cooljarloo北矿的形成不仅受到运营和加工挑战的影响,而且还受到气候和经济因素的影响。本文概述了其中的一些挑战,并讨论了如何随着时间的推移改变脱硝策略以减轻影响。自从1999年调试湿选机以来,一直存在许多典型的操作挑战,以最大限度地提高有价值的重矿物(VHM)的回收率。其中包括:矿坑进料等级不同,煤泥类型和数量不同,VHM和垃圾矿物之间的极端尺寸以及处理岩石矿石的设备可靠性降低。通过以下方法成功解决了这些问题:rn1。矿坑提取策略,rn2。除泥回路的升级,rn3。增稠剂的修改和絮凝剂的变化,rn4。安装升级的和额外的螺旋容量以及rn5。各种饲料制备厂的筛选加上操作团队的独创性,毅力和耐心,VHM的回收率达到了95%以上。然而,典型的加工挑战并不是唯一的障碍。减少降雨和减少水的可利用性,必须对尾矿和煤泥进行战略性的共同处置,以提高回收的速度:地下水的抽取和储水策略也已改变。 Withrnan观察到,地下水补给的速度和幅度降低了,因此过载的补给计划已成为优先的矿山计划功能。结合以上挑战,现行的汇率和矿产品价格已经影响了盈利能力。在2009年全球金融危机最严重的时候,运营策略发生了重大变化,以维持2010年可行的干法采矿运营。与采矿承包商合作,将现有的刮板和半固定饲料制备厂的设置替换为可移动的坑推土机陷阱设施。改变采矿方法和初步筛分的最终结果是将单位成本降低了10%。本文将详细介绍上述在Cooljarloo北矿运营十年中遇到的挑战和成功。

著录项

  • 来源
  • 会议地点 Perth(AU);Perth(AU)
  • 作者

    D Audeyev; N Lawler;

  • 作者单位

    Tiwest Joint Venture – Northern Operations, PO Box 22, Muchea WA 6501. Email: dylan.audeyev@tiwest.com.au;

    Tiwest Joint Venture – Northern Operations, PO Box 22, Muchea WA 6501. Email: nathan.lawler@tiwest.com.au;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿物学;矿物学;
  • 关键词

  • 入库时间 2022-08-26 14:04:10

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号