Challenges and Lessons Learnt Operating the Tiwest ‘North Mine’ (Cooljarloo Mine, Western Australia)

机译:挑战和经验教训经营着Tiwest'tornine'(Cooljarloo Mine,西澳大利亚)

获取原文

摘要

The Cooljarloo North Mine has been shaped not only by operational and processing challenges, but by climatic and economic factors. This paper outlines some of these challenges and discusses how the operating strategy has been altered over time to mitigate the impacts. Since commissioning the wet concentrator in 1999, there have been many typical operational challenges to maximising valuable heavy mineral (VHM) recovery. These include: varying in pit feed grades, different slimes types and volumes, sizing extremes between VHM and trash minerals and decreased equipment reliability handling rocky ore. These issues were successfully mitigated by: 1.in pit extraction strategies, 2.upgrade of the de-sliming circuit, 3.thickener modifi cations and fl occulent changes, 4.installing upgraded and additional spiral capacity, and 5.various Feed Preparation Plant screening initiatives. Combined with the ingenuity, persistence and patience of the operating team, VHM recovery >95 per cent has been achieved. However, typical processing challenges have not been the only hurdles. Reduced rainfall and water availability has necessitated the strategic co-disposal of tailings and slime to increase the speed of water recovery: groundwater abstraction and water storage strategies have also been altered. With an observed reduction in the speed and magnitude of groundwater recharge, overburden backfi ll scheduling has become a priority mine planning function. Combined with the above challenges, the prevailing foreign exchange rate and mineral product prices have impacted profi tability. At the height of the Global Financial Crisis in 2009, major changes to the operating strategy were made to maintain a viable dry mining operation in 2010. Working with the mining contractor the existing scraper and semi-fi xed Feed Preparation Plant set up was replaced with a movable in pit dozer trap facility. The end result of changes to the mining method and primary screening was a ten per cent reduction in unit costs. This article will elaborate on some of the above mentioned challenges and successes achieved over the past ten years of operating the Cooljarloo North Mine.
机译:该Cooljarloo北矿已形成,不仅操作和处理的挑战,但受气候和经济因素。本文概述了这些挑战,并讨论的操作策略是如何被改变,随着时间的推移,以减轻影响。由于试运行,1999年湿集中,出现了最大化有价值的重矿物(VHM)恢复了许多典型的运营挑战。这些措施包括:在坑饲料档次,不同类型的泥和体积不同,上浆VHM和垃圾矿物之间极端,降低了设备的可靠性搬运岩石矿。 1.in坑萃取策略中,脱泥电路的2.upgrade,3.thickener modifi阳离子和FL occulent变化,4.installing升级和附加螺旋容量,和5.各种进料制备装置:这些问题成功地被减轻筛选举措。与独创性,持久性和操作团队的耐心相结合,VHM恢复> 95%的已经达到。然而,典型的处理挑战并不是唯一的障碍。降雨减少和水的可用性必要的战略合作处置尾矿和粘液的增加水回收速度:地下水取水和蓄水的策略也已改变。随着速度和地下水补给的幅度观察到减少,覆土backfi LL调度已成当务之急矿山规划的功能。上述挑战相结合,当时的外汇汇率和矿物产品的价格已经影响PROFI盈利能力。在全球金融危机的2009年的高度,提出了对运营策略的重大变化,以保持在2010年工作与采矿承办商现有的刮刀和半固定成本饲料可行的干采矿作业选煤厂成立替换为在坑推土机陷阱设施的活动。改变到采矿方法和初级筛选的最终结果是在单位成本%削减十。本文将阐述一些的上述挑战,在过去的十多年的经营Cooljarloo北矿所取得的成就。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号