Emergency Sewer Force Main Rehabilitation in Valley Forge National Historic Park

机译:福奇谷国家历史公园的紧急下水道主修复

获取原文
获取原文并翻译 | 示例

摘要

Tredyffrin Township faced three catastrophic failures of a 30-inch prestressed concrete cylinder pipe (PCCP), the Wilson Road Sewage Force Main, between 2012 and 2014. The first failure resulted in a wastewater spill to Valley Creek. Second and third failures occurred just 42 days apart in the spring of 2014. Tredyffrin proactively entered into a voluntary consent decree to ensure a solution was reached in a timely manner given the complex stakeholder environment and threat of legal action from environmental groups.Assessment of the 18,000-ft. force main determined that external corrosion had degraded the strength of the wire inside the 30-inch PCCP, rendering the pipeline unable to handle the system's operating pressure. Working with the engineer CH2M on the project, the method of repair chosen was a thermoplastic close-fit lining system known commercially as Tite Liner®. The system is a high-density polyethylene liner that can provide a fully-structural solution when pulled into place inside the existing pipeline. The Tite Liner® system was engineered and custom made to be slightly larger than the host pipe and installed utilizing a proprietary roller compression system.United Pipeline Systems’ (United) installation method helped minimize disruption and expand system capacity within the Park’s limited jobsite footprint, while also offering low material costs and long installation sections. The lining portion of the project was completed over 3 months in 31 separate installations – on time and on budget – with zero safety incidents or wetlands impacts. This paper will highlight the rehabilitation method selection, project planning and installation.
机译:Tredyffrin Township在2012年至2014年之间遇到了30英寸预应力混凝土圆柱管(PCCP)威尔逊路污水处理厂的三项灾难性故障。第一次故障导致废水溢出到Valley Creek。 2014年春季,第二次和第三次失败仅相隔42天。鉴于复杂的利益相关者环境和环境团体的法律行动威胁,Tredyffrin主动订立了自愿同意令,以确保及时达成解决方案。\ r \ n对18,000英尺的评估压力主管道确定外部腐蚀降低了30英寸PCCP内部导线的强度,使管道无法承受系统的工作压力。与该项目的工程师CH2M合作,选择的维修方法是商业上称为TiteLiner®的热塑性紧密配合衬里系统。该系统是高密度聚乙烯衬管,当将其拉入现有管道内部时可以提供完整的结构解决方案。 TiteLiner®系统经过设计和定制,比主机管道稍大,并使用专有的辊压系统进行安装。\ r \ nUnited Pipeline Systems(United)的安装方法有助于最大程度地减少干扰,并在公园有限的区域内扩展系统容量同时节省了材料成本和较长的安装时间。该项目的衬砌部分按时和按预算在31个单独的装置中完成了3个月的施工,安全事故或湿地影响为零。本文将重点介绍修复方法的选择,项目计划和安装。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号