Bringing the 120-year-old Historic Sault Ste. Marie Canal Powerhouse into the future

机译:带来了120年历史的Sault Ste。玛丽运河发电厂的未来

获取原文
获取原文并翻译 | 示例

摘要

The Sault Ste. Marie Canal National Historic Site (NHS) is operated by Parks Canada Agency. Built between 1889 and 1895, it commemorates an outstanding example of Canadian engineering achievement. In the past, operating the lock was carried out using onsite hydroelectric generation fed from the Saint Mary’s River above the canal. Water flowed through a large steel penstock and into a powerhouse with twin turbines which discharge through two submerged steel pipes downstream of the lock.Parks Canada’s goal is to renew the Sault Ste. Marie Canal NHS to increase visitation through varied visitor experiences that will attract a diverse audience. The powerhouse and related infrastructure, being a key attraction on site, are intended to be transformed into a working museum for current and future generations to enjoy. This process began with a multi-disciplinary assessment of the built structures and process equipment. This paper focuses on the condition assessment of the 300m long, 2,000mm diameter steel penstock pipe, two 45m long steel discharge pipes, 1525mm in diameter, and 30m long dewatering pump discharge pipe, 750mm in diameter.The condition assessment of the pipes involved a variety of inspection and testing methods and included person-entry and robotic inspections with Remote Operated Vehicles (ROV’s) and multisensoring with Closed-circuit Television (CCTV), taking of coupons for metallurgical tests, ultrasonic wall thicknesses, sounding testing, ovality measurements, some in both drained and submerged conditions. Numerous challenges and constraints were considered during planning of the investigations. The challenges, approach, condition assessment technologies, and findings will be described in this paper.
机译:苏圣。玛丽运河国家历史遗址(NHS)由加拿大公园管理局管理。它建于1889年至1895年,是加拿大工程成就的杰出典范。过去,通过使用运河上方的圣玛丽河提供的现场水力发电来进行闸门的操作。水流过大型钢管,并流入带有双涡轮机的动力室,该涡轮机通过闸门下游的两条水下钢管排出。\ r \ nParks Canada的目标是更新Sault Ste。玛丽运河NHS会通过多样化的访客体验来增加访问量,从而吸引不同的受众。该发电站和相关基础设施是该场馆的主要吸引力,旨在被改造成可以供当代和子孙后代享用的博物馆。该过程始于对建筑结构和过程设备的多学科评估。本文着重于300m长,直径2,000mm的钢管,两个45m长的直径1525mm的钢管,以及30m长的直径750mm的排水泵排水管的状态评估。\ r \ n管道涉及多种检查和测试方法,包括使用遥控车(ROV)进行的人员进入和机器人检查以及使用闭路电视(CCTV)进行的多传感器检测,用于冶金测试的试样,超声壁厚,探空测试,椭圆度测量,有些是在排水和淹没条件下进行的。在调查计划期间考虑了许多挑战和限制。本文将描述挑战,方法,状况评估技术和发现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号