Lessons Learned from the NASA Plum Brook Reactor Facility Decommissioning

机译:从美国宇航局梅花布鲁克反应堆设施退役中获得的教训

获取原文
获取原文并翻译 | 示例

摘要

1. The licensee must have privity of contract with the decommissioning contractor.rn2. Formal roles and responsibilities should be established right up front.rn3. Have strong and open 2-way communication within the project.rn4. Have a proactive, open public outreach effort that puts deposits in the 'trust bank'.rn5. Characterize, characterize, characterize.rn6. If you discharged offsite, even legally, expect to at least investigate.rn7. If a plant has been in safe storage for more than a few years special efforts must be planned for and made in the areas of equipment, procedures, and retirees.rn8. Decommissioning planning should focus on waste stream types, volumes, and available disposal paths and costs.rn9. Don't wait until the 'hard part' is done to plan the end of the project in detail - that last 10% will rapidly grow to eat your reserves.rn10. It can be a great job-have fun!
机译:1.被许可人必须与退役承包商有合同特权。应事先确定正式的角色和责任。在项目内进行牢固而开放的双向沟通​​。rn4。进行积极,公开的公众宣传活动,将存款存入“信托银行”。rn5。表征,表征,表征rn6。如果您异地出院,即使合法,也至少要进行调查。如果工厂已经安全存储了几年以上,则必须在设备,程序和退休人员的领域中计划并做出特别的努力。退役计划应关注废物流的类型,数量以及可用的处置途径和成本。不要等到“困难的部分”完成后再详细计划项目的结束时间,最后10%的人会迅速增长以消耗您的储备。rn10。找工作很有趣!

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号