Rehabilitation of the Figueira da Foz Bridge

机译:菲盖拉达福斯大桥的修复

获取原文
获取原文并翻译 | 示例

摘要

The Figueira da Foz Bridge includes a 405 m long cable stayed bridge with a steelrndeck and a main span of 225 m and two prestressed concrete approach viaducts with 45 m spansrnand a total length of 945 m. The rehabilitation included the strengthening of the towers and thernreplacement of the anchorage system of the deck of the cable stayed bridge to the transitionrnpiers. The rehabilitation of the approach viaducts included the strengthening of the deck mainrngirders by external prestressing and the introduction of new dissipating devices between therndeck and the abutments. The general rehabilitation also included local repairing and new surfacernprotection of steel and concrete elements.
机译:Figueira da Foz桥包括一个长405 m的斜拉桥,一个钢甲板,主跨为225 m,以及两个预应力混凝土高架桥,跨度为45 m,总长度为945 m。修复工作包括加强塔架和更换斜拉桥至过渡墩甲板的锚固系统。进场高架桥的修复包括通过外部预应力加强甲板主梁,并在甲板和桥台之间引入新的消散装置。总体修复还包括对钢和混凝土元件进行局部修复和新的表面保护。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号