ACCELERATED BRIDGE CONSTRUCTION METHODS FOR BRIDGE 1-438 REPLACEMENT

机译:桥梁1-438更换的加速桥梁建造方法

获取原文
获取原文并翻译 | 示例

摘要

This paper presents the design and implementation of Accelerated Bridge Construction (ABC)techniques for Bridge 1-438 on Blackbird Station Road over Blackbird Creek. The 50’-0” single span beam bridgeacts as Delaware’s first all precast bridge and incorporates the nation’s second UHPC overlay. It illustrates thepros, cons and lessons learned from using ABC techniques for the replacement of Bridge 1-438. The paper willalso discuss the collaborative efforts between federal and state agencies in producing specifications and plans.
机译:本文介绍了Blackbird Creek上Blackbird Station Road上1-438号桥梁的加速桥梁施工(ABC)\ r \ n技术的设计和实现。 50'-0”单跨梁桥是特拉华州的第一座全预制桥,并结合了美国第二座UHPC覆盖层。它说明了使用ABC技术替代Bridge 1-438的利弊。本文还将\\ r \ n讨论联邦和州机构在制定规范和计划方面的合作。

著录项

  • 来源
  • 会议地点
  • 作者单位

    Delaware Department of Transportation Bridge Design, Dover,Delaware;

    Delaware Department of Transportation Bridge Design, Dover,Delaware;

    Delaware Department of Transportation Bridge Design, Dover,Delaware;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-26 14:32:18

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号