Estimation of pile lengths of a failed school block using the parallel seismic logging method

机译:使用并行地震测井法估算失效校区的桩长

获取原文
获取原文并翻译 | 示例

摘要

The following conclusions can be made for the investigation ⅰ. Most of the driven pile lengths were found to be less than the recommended design length of 30m. Some of the short piles were also found to be on bedrock. ⅱ. At the settled locations, the lengths of the piles were found to be short and installed in the medium dense sand layer. ⅲ. PS tests can be a useful tool to determine approximately the lengths of driven piles in a failure investigation.
机译:对于调查for可以得出以下结论。发现大部分打入桩的长度小于建议的30m设计长度。还发现一些短桩在基岩上。 ⅱ。在沉降位置,发现桩的长度很短,并安装在中等密度的沙层中。 ⅲ。 PS测试可能是确定失效调查中大致确定打入桩长的有用工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号