首页> 外文会议>ASME/ISCIE international symposium on flexible automation 2012 >A METHOD FOR ACTIVITY DURATION ESTIMATION BASED ON PROJECT STABILITY
【24h】

A METHOD FOR ACTIVITY DURATION ESTIMATION BASED ON PROJECT STABILITY

机译:基于项目稳定性的活动时间估计方法

获取原文
获取原文并翻译 | 示例

摘要

During the planning phase in real project management, it is one of essential problems for any project to determine the duration of each activity. This paper proposes a new method for determining the duration of activities of a given project based on a cost associated with the deviation of the starting time of each activity. The proposed method calculates the expected cost associated with a starting time deviation for each activity and then determines the duration of each activity so as to minimize the total expected cost. The proposed method is compared with some conventional methods. The numerical results derive some properties of the estimation methods and demonstrate the effectiveness of the proposed method.
机译:在实际项目管理的规划阶段,确定每个活动的持续时间是任何项目的基本问题之一。本文提出了一种基于与每个活动的开始时间的偏差相关的成本来确定给定项目的活动持续时间的新方法。所提出的方法计算与每个活动的开始时间偏差相关的预期成本,然后确定每个活动的持续时间,以使总预期成本最小化。将该方法与一些常规方法进行了比较。数值结果推导了估计方法的一些性质,并证明了该方法的有效性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号