首页> 外文会议>ASME international pipeline conference 2008 >INTEGRITY OF OLD PIPELINES BURIED IN PETROLEUM PRODUCTS STORAGE TERMINALS
【24h】

INTEGRITY OF OLD PIPELINES BURIED IN PETROLEUM PRODUCTS STORAGE TERMINALS

机译:石油产品存储终端中埋藏的旧管道的完整性

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

This work aims to present the results obtained from the experience gained through the accomplishment of the inspection with the ultrasonic umbilical pig in a non-piggable internal pipe buried in the Transpetro Storage Terminal in Sao Caetano do Sul, in Sao Paulo, Brazil.rnThe pipeline considered in this work is a line for marine fuel oil, which, because of its high viscosity, must be heated in order to flow. The oil is heated in the terminal by the steam produced in boilers. The heat transfer may occur in a heat exchanger or inside the storage tank, and the pipeline referred is thermally isolated. So that the line could be inspected, it was divided in two parts, one upstream of the pumps (suction), which is a 12-inch line, and the other downstream of the same pumps (discharge), which is a 14-inch line.rnThis work has been developed by Transpetro's Pipeline Operation, Maintenance, Inspection and Safety Departments together, since the planning phase, passing by the job execution and getting to the conclusion.rnTo begin with, the operational liberation of the line had to be agreed between all the departments involved with the PIG inspection, which were mentioned before, and Transpetro's Logistics Department.rnOnce the PIG passage was scheduled, an initial cleaning had to be performed by the Operation Activity. Since this line is non-piggable, the installation of adaptations was necessary. After that, the passage of cleaning PIGs was possible, and the line sections could be enabled.rnThe next step was the inspection of the pipeline with umbilical ultrasonic PIGs. After the passage of these PIGs, the adaptations had to be removed and the pipeline had to be conditioned for the operational return.rnAfter this part of the inspection was finished, the verification of the results issued was necessary. Once the theoretical results were available, ditches were opened for correlation inspection and temporary repairs in the most critical points for the operation were applied.rnThe last part of the work consists in an analysis study of technical and economical viability for rehabilitation of the lines.
机译:这项工作的目的是介绍通过将超声波脐带猪在巴西圣保罗的圣卡塔塔诺杜南的Transpetro储存终端中埋入的不可固定的内管中完成超声检查而获得的经验结果。在这项工作中考虑的是船用燃料油生产线,由于其高粘度,必须对其进行加热才能流动。锅炉中产生的蒸汽在终端加热油。传热可能发生在热交换器中或储罐内部,并且所涉及的管道是热隔离的。为了检查该管线,将其分为两部分,一个在泵的上游(抽吸),是一条12英寸的管线,另一个在同一泵的下游(排放),是14英寸的管线,自计划阶段以来,Transpetro的管道运营,维护,检查和安全部门共同开发了这项工作,通过工作执行并得出结论.rn首先,必须商定该线的运营解放在前面提到的所有与PIG检查有关的部门之间,以及Transpetro的后勤部门之间。安排PIG通过之后,运营活动必须进行初步清洁。由于这条线是不可固定的,因此必须安装改编件。之后,便可以通过清洗PIG,并且可以启用管线部分。下一步是使用脐带超声PIG检查管道。这些PIG通过之后,必须撤消改编,并且必须对管道进行操作返回的条件调整。rn在完成这部分检查之后,有必要对发布的结果进行验证。一旦获得了理论结果,便会打开沟渠进行相关检查,并在操作的最关键点进行临时维修。rnn的最后一部分是对管道修复技术和经济可行性的分析研究。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号