首页> 外文会议>Asia-Pacific Power and Energy Engineering Conference;APPEEC >Optimal Planning for the Placement of FACTS Devices by Differential Evolution Technique for the Increased Loadabilty of a Power System
【24h】

Optimal Planning for the Placement of FACTS Devices by Differential Evolution Technique for the Increased Loadabilty of a Power System

机译:利用差分进化技术优化FACTS装置的布局,以提高电力系统的负载能力

获取原文

摘要

This paper presents Differential Evolution (DE) based approach for the allocation & coordinated operation of multiple FACTS (Flexible AC Transmission System) devices for the improvement of power transfer capacity in an interconnected power system. The DE based approach is applied on IEEE 30-bus system. The system is reactively loaded starting from base to 200 % of base load. FACTS devices are installed in the different locations of the power system and system performance is noticed with and without FACTS devices. First, the locations, where the FACTS devices to be placed is determined by calculating active and reactive power flows in the lines. A Differential Evolution based algorithm is then applied to find the amount of magnitudes of the FACTS devices. A comparative analysis with PSO (Particle Swarm Optimization) is also done. This approach of Differential Evolution based placement of FACTS devices is tremendous beneficial both in terms of performance and economy is clearly observed from the result obtained.
机译:本文提出了一种基于差分进化(DE)的方法,用于多个FACTS(柔性AC传输系统)设备的分配和协调操作,以提高互连电力系统中的电力传输能力。基于DE的方法应用于IEEE 30总线系统。从基础负载到基础负载的200%开始对系统进行无功负载。 FACTS设备安装在电力系统的不同位置,无论有无FACTS设备,系统性能均得到关注。首先,通过计算线路中的有功功率和无功功率来确定要放置FACTS设备的位置。然后应用基于差分进化的算法来找到FACTS设备的幅度数量。还进行了与PSO(粒子群优化)的比较分析。从获得的结果清楚地观察到,这种基于差异进化的FACTS器件放置方法在性能和经济性方面都具有极大的好处。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号