DURATION-DEPENDENT MULTI-SCHEDULE EVOLUTIONARY CURRICULUM TIMETABLING

机译:持续时间依赖的多计划进化课程时间表

获取原文
获取原文并翻译 | 示例

摘要

Educational institutions are usually involved in planning timetables for examination and curriculum. Of the two, the latter is usually more complex. It is typical that institutions are usually faced with a set of unique requirements. Each curriculum timetable consists of several components and they tend to differ significantly among institutions. The curriculum timetable of the school of Electrical and Electronic Engineering (EEE) in Nanyang Technological University (NTU), which has five components, is no exception. Each of the components can be planned separately as an individual schedule. Each of these schedules constitutes a species and co-evolved together to obtain the optimum timetable. Multi-schedule evolution has been found to be effective in finding a feasible optimum curriculum timetable in the case of EEE, NTU.
机译:教育机构通常参与计划考试和课程表。在这两者中,后者通常更为复杂。通常,机构通常面临一系列独特的要求。每个课程表都包含几个组成部分,并且各机构之间往往存在很大差异。南洋理工大学(NTU)的电气与电子工程学院(EEE)的课程时间表也不例外,该时间表由五个部分组成。每个组成部分都可以作为单独的计划单独计划。这些时间表中的每一个都构成一个物种,并共同演化以获得最佳时间表。在EEE,NTU的情况下,已发现多计划演化对于找到可行的最佳课程时间表是有效的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号