California's policy goals for achieving zero net energy (ZNE) in buildings along with the renewable portfolio standard (RPS) requirements will flex and strain the state's existing electricity grid. Changing load profiles from high efficiency ZNE buildings, enhanced demand response (DR) capabilities for reducing peak; and the high penetration of distributed generation (DG), especially solar PV, present a new set of challenges for the grid. By conservative estimates the solar market for residential new construction alone will need to increase 50 fold to meet the state's ZNE goal by 2020. An even larger proportion of distributed generation is expected from other market sectors, increasing the challenges the utilities face in managing the electricity grid. The CSI Program was launched in 2007 and is overseen by the California Public Utilities Commission (CPUC). With a budget of over $2 billion dollars, the CSI aims to install 3000 MW of solar capacity in ten years. To support this lofty goal, the Commission approved a $50 million dollar carve out for solar research, development and demonstration. This paper will discuss the grid integration challenges facing the ZNE future along with how the California Solar Initiative's (CSI) Research Development Deployment and Demonstration (RD&D) Program is finding solutions through a portfolio of solar research projects. The range of RD&D projects include software tools for optimizing integrated demand side management (IDSM) by combining energy efficiency measures, demand response strategies with advanced storage and PV at the building and community level, to utility-scale analysis tools that study the impacts of DG on the distribution feeders and grid operations. These research projects address grid integration issues including interconnection of intermittent DG resources, innovative utility tariffs, and incorporation of advanced storage, solar forecasting, and advanced inverters for smart operation.
机译:加州实现建筑物零净能源(ZNE)的政策目标以及可再生能源投资组合标准(RPS)的要求,将使该州现有的电网更加灵活和紧张。改变高效率ZNE建筑物的负荷状况,增强需求响应(DR)功能以减少高峰;分布式发电(DG)的高普及率,尤其是太阳能光伏发电,对电网提出了一系列新的挑战。据保守估计,到2020年,仅住宅新建筑的太阳能市场就需要增加50倍才能达到该州的ZNE目标。预计其他市场部门的分布式发电比例将更大,这将增加公用事业在管理电力方面面临的挑战网格。 CSI计划于2007年启动,由加利福尼亚公共事业委员会(CPUC)监督。 CSI的预算超过20亿美元,其目标是在十年内安装3000兆瓦的太阳能容量。为了支持这一崇高目标,委员会批准了一项5,000万美元的拨款,用于太阳能研究,开发和示范。本文将讨论ZNE未来面临的电网集成挑战,以及加利福尼亚太阳能计划(CSI)的研究开发部署和演示(RD&D)计划如何通过一系列太阳能研究项目寻找解决方案。 RD&D项目的范围包括用于通过结合能效措施,建筑物和社区一级的高级存储和PV的需求响应策略,综合需求侧管理(IDSM)的软件工具,以及研究DG影响的公用事业规模分析工具。关于配电馈线和电网运行。这些研究项目解决了电网集成问题,包括间歇性DG资源的互连,创新的公用事业费率,以及用于智能运营的高级存储,太阳能预测和高级逆变器的集成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号