Contemporaneous 'As-Is' Period Schedule Delay Methodology - Forensic Delay Methodology MIP 3.3

机译:同期“按原样”周期计划延迟方法-法医延迟方法MIP 3.3

获取原文

摘要

The Observational/Dynamic/Contemporaneous As-ls analysis is a retrospective technique that divides the total project duration into smaller periods (also known as windows). The Contemporaneous Period Analysis has three identified variations with AACE® RP29R-03. The MIP 3.3 variation focuses on the usage of the periodic schedules submitted during the performance of the project as the basis to identify and quantify delays. In this methodology, the utilized schedules are relied on in their contemporaneous state of submission (i.e., 'as-is') and avoid analyst-inserted modifications to the submitted schedules, or in some cases, may perform minor adjustments. The paper examines the rationale behind using this method, discusses its strengths and weaknesses, and addresses the challenges an analyst may face while performing this type of analysis. Further, this paper critically examines the arguments for and against this methodology and provides useful recommendations to assist the analyst in deciding if this method is suitable for the case at hand.
机译:观察/动态/同时期分析是一种回顾性技术,可将项目总工期分成较小的时间段(也称为窗口)。同时期分析使用AACE®RP29R-03具有三个已识别的变体。 MIP 3.3的变化重点是在项目执行期间提交的定期进度表的使用,以此作为识别和量化延迟的基础。在这种方法中,所使用的时间表以其同时提交的状态(即``按原样'')为依据,并避免了分析师插入的对提交时间表的修改,或者在某些情况下可能会进行较小的调整。本文研究了使用此方法的基本原理,讨论了该方法的优缺点,并解决了分析师在执行此类分析时可能面临的挑战。此外,本文严格审查了支持和反对该方法的论点,并提供了有用的建议,以帮助分析师确定该方法是否适合当前情况。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号