首页> 外文会议>Annual Loss Prevention Symposium; 20070422-26; Houston,TX(US) >A Successful Approach to Improve Energy Utilization in Ethylene Units
【24h】

A Successful Approach to Improve Energy Utilization in Ethylene Units

机译:提高乙烯装置能源利用率的成功途径

获取原文
获取原文并翻译 | 示例

摘要

Energy represents a significant portion of the cost to produce ethylene in anrnolefins plant. With the recent increases in energy costs and corporaterncommitment to reducing CO2 emissions, Shell Chemical Company has embarkedrnon a program to identify and implement quick payback energy reductionrnopportunities in its ethylene plants through the Shell Global Solutions energyrnmanagement program. The energy management program has successfullyrnreduced energy and variable costs by 3 to 5 % at the ethylene plants with shortrnimplementation time, quick payback projects. In this paper, the energyrnmanagement program will be referred to as the Energize Program. Energizernprojects identified and implemented at the ethylene plants include operationalrnchanges, and expense and low capital cost projects that have resulted in energyrnreduction, reliability improvement, yield improvement, and capacity creep.rnOur experience is that the plant engineers and specialists are very busyrnoperating the units and do not have sufficient time to work on energyrnimprovement projects. Many good ideas that staff and operators have thatrnrequire further evaluation and development tend to not get worked on. ThernEnergize team brings additional process engineer resources into the plant tornwork with the staff to scope and implement the projects. Working closely withrnplant personnel insures staff ownership of the projects and will help sustain thernsavings after the Energize team leaves. The paper will discuss the makeup of anrnEnergize team, the methodology of study, and the timeline for implementing arnplant program.
机译:能源占在烯烃工厂生产乙烯的成本的很大一部分。随着近期能源成本的上涨以及企业减少二氧化碳排放的承诺,壳牌化工公司开始实施一项计划,通过壳牌全球解决方案能源管理计划,在乙烯工厂中识别并实施快速回收能源的减少机会。能源管理计划已成功缩短了乙烯工厂的能源和可变成本3-5%,实现时间短,投资回收期短。在本文中,能源管理计划将称为能源计划。在乙烯工厂确定并实施的Energizern项目包括运营变更,费用和低资本成本项目,这些项目已导致能耗降低,可靠性提高,产量提高和产能上升。我们的经验是,工厂工程师和专家们非常忙于对设备进行操作。没有足够的时间从事能源改善项目。员工和操作人员需要进一步评估和发展的许多好主意往往无法付诸实践。 ThernEnergize团队将额外的过程工程师资源带入工厂的撕裂工作中,与员工一起确定项目范围并实施项目。与工厂人员紧密合作可确保员工对项目的所有权,并将在Energize团队离开后帮助维持项目节约。本文将讨论annergize团队的组成,研究方法以及实施arnplant计划的时间表。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号