首页> 外文会议>American Water Works Association annual conference exposition;American Water Works Association >TMDL Compliance: What Does it Take? How Much Does it Cost? A Case Study of City of Torrance, CA
【24h】

TMDL Compliance: What Does it Take? How Much Does it Cost? A Case Study of City of Torrance, CA

机译:TMDL合规性:需要什么?它要多少钱?加利福尼亚托伦斯市的个案研究

获取原文
获取原文并翻译 | 示例

摘要

1.Overall TMDL Compliance:rn– The City already complies with the 2014 TMDL limitsrn– Removal of Phosphorus governs compliance for 2018 TMDL limitsrn2.Total Phosphorus Removal Requirementrn– Existing Load : 653 kg/yrrn– 2018 TMDL limit : 301 kg/yrrn– Removal Needed : 352 kg/yearrn3.Phosphorus TMDL Compliance Plan:rn– Street sweeping : 39 kg/yrrn– Catch Basin inserts : 7 kg/yrrn– Airport BMP : 313 kg/yrrn– Walnut Sump BMP : 13 kg/yrrn– Baseball Field BMP : 2 kg/yrrn4.Estimated Program Costrn– Non- Structural BMPs : $ 7.5 millionrn– Structural BMPs : $ 11.4 million
机译:1.总体TMDL符合性:rn –纽约市已符合2014 TMDL限值rn –去除磷决定了2018 TMDL限值的符合性rn2。总磷去除要求rn –现有负荷:653 kg / yrrn – 2018 TMDL限值:301 kg / yrrn–需要清除:352千克/年3.磷TMDL遵守计划:rn –扫街:39千克/年–集水区插件:7千克/年–机场BMP:313千克/年–核桃S BMP:13千克/年–棒球实地BMP:2公斤/年4.估计的计划成本–非结构性BMP:750万美元rn–结构性BMP:1140万美元

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号