首页> 外文会议>American Water Works Association annual conference exposition;American Water Works Association >Pretreatment Improvements To Achieve Phase IV Of Partnership For Safe Water
【24h】

Pretreatment Improvements To Achieve Phase IV Of Partnership For Safe Water

机译:进行预处理改进,以实现安全用水合作伙伴关系的第四阶段

获取原文
获取原文并翻译 | 示例

摘要

1.“Excellence in Water Treatment Award”rn2.Filter run times increased from 48 to 72 hours resultingrnin an increase in water recoveryrn3.Backwash and filter to waste water recovery achieved byrnconverting two sedimentation basins to backwashrnsettling basinsrn4.Staff feels they could have reached the filter effluentrnturbidity goal by operations and coagulant changesrnalone.rn5.But, settled water turbidity probably not achievablernwithout capital improvements to the sedimentationrnbasins
机译:1.“水处理卓越奖” rn2。过滤器的运行时间从48小时增加到72小时,从而增加了水的回收率rn3。通过将两个沉淀池转换为反冲洗的沉淀池rn4实现了反冲洗和过滤器对废水的回收rn4。员工感觉他们已经达到了5,但是,如果不对沉淀池进行资本改造,可能无法实现沉淀水的浊度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号