BRINGING WATER TO HISTORIC ROANOKE ISLAND AND ECONOMIC STIMULUS TO DARE COUNTY THROUGH CONSTRUCTION MANAGERAT- RISK DELIVERY

机译:通过有风险的施工管理人员,为历史悠久的ROANOKE岛和经济刺激带水到DARE县

获取原文

摘要

Historically, municipal water/wastewater projects were required to navigate the traditional design-bid-buildprocess. However, in 2001, the North Carolina General Assembly formally approved two alternative deliveryoptions: construction manager-at-risk (CMAR) and design-bid-build using single-prime bidding.CMAR offers numerous potential advantages, including a single point of responsibility, better cost and schedulecontrol, and opportunities to manage project workflow. Since the General Assembly’s decision to allowalternative delivery, Dare County has taken advantage of CMAR for two water system projects.The recent and most significant project was the Roanoke Island Water System Expansion Program whichrepresents Dare County’s (County) vision to improve and ensure the health and security of its citizens bydelivering a more reliable, sustainable, and higher quality of potable water that will also provide fire protection.The CMAR portion of the Roanoke Island Water System Expansion Program presents an opportunity for theCounty to more efficiently manage the costs required for these improvements, enhance construction quality, andintroduce opportunities for the local workforce. This project includes approximately 56 miles of potable waterpipe, a 2-million-gallon ground storage tank, and a 0.3-million-gallon elevated storage tank.The County, working with the CDM Smith design team and CDM Constructors (CCI) as the constructionmanager, successfully completed the Roanoke Island Water System Expansion in November 2012. Thesuccess milestones included:1.There has been no condemnation of any property easement across the island.2.Approximately 60 percent of the construction was delivered by Dare County subcontractors and nearly 85percent by regional contractors.3.Homeowners are receiving insurance reductions upon installation of the fire hydrant system.4.Disturbances to the environment and local business were minimal.5.The project was delivered for approximately $900,000 below the guaranteed maximum price.
机译:从历史上看,市政水/废水项目需要经过传统的设计-投标-建造过程。但是,在2001年,北卡罗莱纳州大会正式批准了两种备选交付方式:风险施工经理(CMAR)和使用一次性抵押投标的设计投标建造。CMAR具有许多潜在的优势,包括单一责任点,更好的成本和进度控制,以及管理项目工作流的机会。自大会决定允许替代性交付以来,大尔县已利用CMAR开展了两个供水系统项目。最近也是最重要的项目是罗阿诺克岛供水系统扩展计划,该计划代表了大尔县(县)改善并确保健康和健康的愿景。通过提供更可靠,可持续和更高质量的饮用水来提供公民安全,从而提供防火保护。罗阿诺克岛供水系统扩展计划的CMAR部分为县提供了一个机会,可以更有效地管理这些改进所需的成本,提高施工质量,并为当地劳动力提供机会。该项目包括约56英里的饮用水管,一个200万加仑的地面储水箱和一个30万加仑的高架储水箱。该郡与CDM Smith设计团队和CDM建造商(CCI)合作担任施工经理,于2012年11月成功完成了罗阿诺克岛供水系统的扩建。成功的里程碑包括:1.整个岛上没有任何财产租赁的谴责。2。约60%的建设工程由Dare County分包商交付,近85% 3.安装消防栓系统后,房主将获得保险减免; 4。对环境和当地业务的干扰最小。5。该项目的交付价格比最高价格低了约90万美元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号