首页> 外文会议>Advances in environmental vibration. >Dynamic Responses Analysis on High Speed Railway Subgrade and Subgrade-bridge Transition
【24h】

Dynamic Responses Analysis on High Speed Railway Subgrade and Subgrade-bridge Transition

机译:高速铁路路基与路桥过渡的动力响应分析

获取原文

摘要

For roadbed and the transition section easily lead to problems of high -speed railway,dynamic response tests of the high r embankment , low embankments, cuttings, half cutting roadbed and filling and excavation of transition section between bridge r and subgrade are carried out when high — speed train passes. Through analyzing large amounts of data ,the conclusions are r made that dynamic displacement changes of different forms of embankment are not obvious as the train speed , and acceleration r increase significantly with the continuous improvement of train speed. Dynamic response of the cut is greater than that of r the high embankment and half -filled and half-dug embankment, and dynamic response of low embankment is the minimum. In r addition, the dynamic response of filling transition section is significantly larger than the cut transition section. The r main reason is that the construction quality of the filling transition section is difficult to guarantee test by ground r penetrating radar. Moreover,it is also found that the dynamic response of transition section increases with the train speed r improvement. And in a certain distance to the abutment which is 31m in this article,the dynamic response of the transition r section decreases with the increase of the distance from bridge abutment.
机译:对于路基和过渡段容易引起高速铁路问题,高桥高路堤,低路堤,路,石,路基半切路基以及高桥高路基之间过渡段的填土和开挖进行动力响应试验。 -高速列车通过。通过大量数据分析,得出结论:随着列车速度的变化,不同形式路堤的动态位移变化不明显;随着列车速度的不断提高,加速度r明显增加。路堤的动力响应大于高路堤,半填半挖路堤的动力响应,低路堤的动力响应最小。另外,填充过渡段的动态响应明显大于切割过渡段。主要原因是灌装过渡段的施工质量难以保证地面穿透雷达的测试。此外,还发现过渡段的动态响应随着列车速度r的提高而增加。在距基台一定距离(31m)处,过渡段r的动力响应随距桥基距离的增加而减小。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号