Bakersfield Wastewater Treatment Plant 3 - Innovative, Sustainable, and a Good Neighbor

机译:贝克斯菲尔德废水处理厂3-创新,可持续发展和睦邻

获取原文
获取原文并翻译 | 示例

摘要

Bakersfield Wastewater Treatment Plant 3 (Plant 3) Upgrade and Expansion Project aimed atrnaddressing capacity, process reliability, renewable energy and regulatory requirements. Prior tornupgrades, Plant 3 violated its effluent discharge permit because the inflow exceeded the ratedrncapacity and the plant lacked the required treatment. Several innovative, out-of-box processrnmodification, and costs and energy-saving ideas were incorporated into the design such asrnconversion of decommissioned trickling filters to biofilters for odor control, an extensive andrncreative odor control for “Zero Odor” plant, conversion of old secondary clarifiers to coveredrnprimary clarifiers, integrated renewable energy system with biomass energy and PV solar energyrnfor significant GHG reduction, and LEED-type buildings. This sustainable project earned morernthan $7 million in rebates/grants/incentives. The annual operating cost savings are estimated atrn$556,000. Completed on time with excellent team effort and safety record, Plant 3 hasrnoutperformed all regulatory requirements.
机译:贝克斯菲尔德废水处理厂3(工厂3)升级和扩建项目旨在解决产能,工艺可靠性,可再生能源和法规要求。在升级之前,第3号工厂违反了其废水排放许可证,因为流入量超过了额定容量,并且该工厂缺乏所需的处理方法。几个创新的,即开即用的流程改进,成本和节能理念被纳入设计中,例如将退役的滴滤池转换为用于气味控制的生物滤池,为“零气味”工厂进行广泛的增创式气味控制,对旧的二次处理进行转换澄清池,主要澄清池,可再生能源与生物质能和光伏太阳能的集成,以显着减少温室气体排放,以及LEED型建筑物。这个可持续项目获得了超过700万美元的回扣/赠款/奖励。每年节省的运营成本估计为556,000美元。工厂3按时完成,具有出色的团队合作精神和安全记录,其性能未达到所有法规要求。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号