首页> 外文会议>7th International Symposium on Mining With Backfill, 2001 >Operating and Technical Issues in the Implementation of Paste Backfill at the Brunswick Mine
【24h】

Operating and Technical Issues in the Implementation of Paste Backfill at the Brunswick Mine

机译:不伦瑞克矿山实施浆体回填过程中的操作和技术问题

获取原文
获取原文并翻译 | 示例

摘要

The Brunswick Mine, a Division of Noranda Inc., produces zinc, lead, copper, and bulk lead-zinc concentrates through underground mining of a large massive sulphide deposit. The mining method employed is longhole open stoping with delayed backfilling. In 1996 Brunswick began a review of its mining methods and backfilling operations. In 1997 the decision was made to convert the backfill system from cemented and uncemented rockfill to paste backfill prepared from mill tailings. This paper will describe the features of the backfill preparation and distribution systems, review the handling of technical issues, and discuss experiences since plant commissioning.
机译:诺兰达公司(Noranda Inc.)子公司不伦瑞克(Brunswick)矿场通过地下开采大量块状硫化物矿床生产锌,铅,铜和块状铅锌精矿。所采用的采矿方法是深孔露天采矿,并有延迟回填。 1996年,不伦瑞克(Brunswick)开始对其采矿方法和回填作业进行审查。 1997年,决定将回填系统从胶结和非胶结石料转换为由磨机尾矿制备的浆状回填。本文将介绍回填准备和分配系统的功能,回顾技术问题的处理,并讨论自工厂投产以来的经验。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号