首页> 外文会议>The 6th international symposium on in-situ rock stress >Simulation study of support design of cut and fill mine method at Underground Gold Mine
【24h】

Simulation study of support design of cut and fill mine method at Underground Gold Mine

机译:地下金矿充采法支护设计的仿真研究。

获取原文
获取原文并翻译 | 示例

摘要

In the last decade, the price of gold continues to rise, that generate mining activities increasernlinearly. Indonesia is one of the top ten gold producers in the world. One of the gold mines inrnIndonesia is Cibaliung Underground Gold Mine where located in west part of Java Island. Follows therntrend, increasing production will be further target of this company.rnThe type of ore of Cibaliung underground gold mine is vein with low sulphidation. Basalticrnandesite, andesite porphyritic, andesite breccia and vein breccia are constituent rocks and altered byrnsmectite and chlorite. The mining method that carried out this mine is relative similar with somernunderground gold mines in Indonesia (Pongkor and Nusa Halmahera Mining) i.e. cut and fill miningrnmethod. For underground mine, geological information is a key to design such as geological structure,rnrock mass classification, discontinuities, and other geological parameters. They are linked each other.rnFour types support system has been recommended in Cibaliung mine. However some cracks stillrnoccurred in shotcrete support system along decline access. This paper discusses about support designrnof cut-and-fill mine method at underground gold mine. Commercial software namely Phase2® is usedrnto review the stability of support system. Rock mass classification includes Q system and RMR, andrnlaboratory tests were carried out to determine parameter for numerical modeling analysis.
机译:在过去的十年中,黄金价格持续上涨,导致采矿活动呈线性增长。印度尼西亚是世界十大黄金生产国之一。印度尼西亚的金矿之一是Cibaliung地下金矿,位于爪哇岛的西部。顺应潮流,增产将是该公司的进一步目标。Cibaliung地下金矿的矿石类型为低硫化矿脉。玄武质锰铁矿,安山岩斑状,安山岩角砾岩和脉角砾岩是构成岩石,并由蒙脱石和绿泥石改变。实施该矿的采矿方法与印度尼西亚的一些地下金矿(Pongkor和Nusa Halmahera采矿)相对类似,即挖矿和填埋法。对于地下矿山,地质信息是设计的关键,例如地质结构,岩体分类,不连续性和其他地质参数。它们彼此链接。在Cibaliung矿山中,建议使用四种类型的支持系统。但是,沿下降通道,喷射混凝土支撑系统中仍出现一些裂缝。本文讨论了地下金矿的支护设计填埋法。商业软件(即Phase2®)用于评估支持系统的稳定性。岩体分类包括Q系统和RMR,并进行了实验室测试以确定用于数值建模分析的参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号