This paper provides an overview of the 9 Mt/a bin to bin shaft hoisting system supplied by MAN GHH Australia to the Western Mining Corporation's Olympic Dam operations as part of the $1.5B expansion project which will almost treble production. The heart of the system is the 6.5 MW Integrated Friction Winder utilising a variable speed squirrel cage induction motor powered by a Cyclo-converter and incorporating a sophisticated speed distance protection system and four channel closed loop braking. This is the first integrated winder to be installed in Australia and the largest of its type in the world. The rope guided, two skip system has a payload of 36.5 tonnes and a cycle time of 1 1/2 minutes.
机译:本文提供了9 Mt / a箱到箱竖井提升系统的概述,该系统由澳大利亚曼格·GHH提供给西部矿业公司的奥林匹克大坝运营,作为$ 1.5B扩展项目的一部分,该项目将使产量提高近三倍。该系统的核心是6.5 MW一体式摩擦绕线机,该绕线机采用了由Cyclo-converter供电的变速鼠笼式感应电动机,并集成了先进的速度距离保护系统和四通道闭环制动。这是澳大利亚首台安装的一体式络筒机,是世界上同类机中规模最大的络筒机。绳索引导的两个skip斗系统的有效载荷为36.5吨,循环时间为1 1/2分钟。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号