【24h】

On plan adaption through planning graph analysis

机译:通过计划图分析进行计划调整

获取原文
获取原文并翻译 | 示例

摘要

Fast plan adaptation is important in many AI applications requireing a plan management module. From a thoretical point of view, inthe worst case plan adaptation is no more efficient than a complete regeneration of the plan. However, in practice adapting an existing plan can be much more efficient than generating a new one from scratch, especially when the changes to the plan that are required concern only some circumscribed parts of the plan. In this paper we discuss a simple plan-adaptation method based on Blum and Furst's Planning Graphs approach. The method is domain-independent and explotis the planning graph structure for a fast identification of the flaws that are present in the plan, and for fixing them by replanning limited portions of the plan. We present results from some experiments aimed at testing our method with several modifications of planning problems that are hard to solve for current planners based on planning graphs, such as IPP, Graphplan, and Blackbox. These results show that the method in practice is very efficient, especially when the plan can be adapted by changes that are localized in restricted parts of the original plan.
机译:在需要计划管理模块的许多AI应用程序中,快速计划调整很重要。从理论上讲,在最坏的情况下,计划的适应仅比计划的完全重新生成更有效。但是,在实践中,适应现有计划要比从头开始生成新计划更为有效,尤其是当需要对计划进行的更改仅涉及计划的某些外接部分时。在本文中,我们讨论了一种基于Blum和Furst的“计划图”方法的简单计划自适应方法。该方法与领域无关,并解释了计划图结构,用于快速识别计划中存在的缺陷,并通过重新计划计划的有限部分来修复它们。我们提供了一些旨在测试我们的方法的实验结果,这些实验对计划问题进行了一些修改,这些问题对于基于计划图(例如IPP,Graphplan和Blackbox)的当前计划者来说很难解决。这些结果表明,该方法在实践中非常有效,尤其是当计划可以通过原始计划的受限部分中本地化的更改进行调整时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号