Risk Analysis of NPP in Multi-unit Site for Configuration of AAC Power Source

机译:AAC电源配置中多机组现场核电厂的风险分析

获取原文
获取原文并翻译 | 示例

摘要

Because of the difficulties in finding new sites for nuclear power plants, more units are being added to the existing sites. In these multi-unit sites, appropriate countermeasures should be established to cope with the potential station blackout (SBO) accident. Currently, installation of additional diesel generator (DG) is considered to ensure an alternative AC power source, but it has not been decided yet how many DGs should be installed in a multi-unit site. In this paper, risk informed decision making method, which evaluates reliability of electrical system, core damage frequency, and site average core damage frequency, is introduced to draw up the suitable number of DG in multi-unit site. The analysis results show that installing two DGs lowered the site average core damage frequency by 1.4% compared to one DG in six unit site. In the light of risk-informed decisions in regulatory guide 1.174, there is no difference of safety between two alternatives. It is concluded that one emergency diesel generator sufficiently guarantees safety against station blackout of nuclear power plants in multi-unit site.
机译:由于在寻找新的核电站地点方面存在困难,因此将更多的机组添加到现有的地点中。在这些多单元站点中,应建立适当的对策以应对潜在的车站停电(SBO)事故。目前,正在考虑安装附加的柴油发电机(DG)以确保使用替代的交流电源,但是尚未确定在多机组站点中应安装多少个DG。本文介绍了一种风险知情决策方法,该方法可评估电气系统的可靠性,铁心损坏频率和站点平均铁心损坏频率,以制定适合多单元站点的DG数量。分析结果表明,与在六个单元站点中的一个DG相比,安装两个DG可以将站点的平均核心损坏频率降低1.4%。根据法规指南1.174中有关风险的决策,两种选择之间的安全性没有差异。结论是,一台应急柴油发电机足以确保多机组场核电站停电的安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号