Risk Analysis of NPP in Multi-unit Site for Configuration of AAC Power Source

机译:用于配置AAC电源的多单元现场NPP的风险分析

获取原文

摘要

Because of the difficulties in finding new sites for nuclear power plants, more units are being added to the existing sites. In these multi-unit sites, appropriate countermeasures should be established to cope with the potential station blackout (SBO) accident. Currently, installation of additional diesel generator (DG) is considered to ensure an alternative AC power source, but it has not been decided yet how many DGs should be installed in a multi-unit site. In this paper, risk informed decision making method, which evaluates reliability of electrical system, core damage frequency, and site average core damage frequency, is introduced to draw up the suitable number of DG in multi-unit site. The analysis results show that installing two DGs lowered the site average core damage frequency by 1.4% compared to one DG in six unit site. In the light of risk-informed decisions in regulatory guide 1.174, there is no difference of safety between two alternatives. It is concluded that one emergency diesel generator sufficiently guarantees safety against station blackout of nuclear power plants in multi-unit site.
机译:由于寻找核电厂的新网站的困难,正在添加更多单位。在这些多单元网站中,应建立适当的对策,以应对潜在站停电(SBO)事故。目前,考虑安装额外的柴油发电机(DG)以确保备用交流电源,但尚未决定在多单元站点中安装有多少DGS。在本文中,引入了评估电气系统的可靠性,核心损伤频率和站点平均核心损伤频率的风险明智的决策方法,以提高多单元站点中的合适数量的DG。分析结果表明,与六个单位网站中的一个DG相比,安装两个DGS将站点平均核心损伤频率降低1.4%。根据监管指南1.174的风险明智的决定,两个替代方案之间的安全差异。结论是,一个紧急柴油发电机充分保证了多单元现场中核电站驻地停电的安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号