RESPONSE STRATEGY AND HIERARCHY OF WOL-SONG 2, 3, AND 4 NUCLEAR POWER PLANT ABNORMAL OPERATING MANUALS

机译:WOL-SONG 2、3和4核电站异常操作手册的响应策略和层次结构

获取原文
获取原文并翻译 | 示例

摘要

Wolsong 2, 3, and 4 are CANDU 6 pressurized heavy water nuclear power plants, each with a gross electrical output of 715MW(e). The plants were constructed in the Republic of Korea during the 1990s. The three Wolsong units are based on the previous CANDU Wolsong Unit 1, declared in service in 1983. All four units are presently in commercial service. The Wolsong abnormal operating manuals were developed in a cooperative effort between Atomic Energy of Canada Limited, Korea Power Engineering Com- pany staff, and Korea Electric Power Corporation. The role of Atomic Energy of Canada Limited in performing risk assessment studies and supporting CANDU stations for the preparation of emergency operating procedures has greatly ben-efited the Wolsong abnormal operating manual program. Korea Electric Power Corporation provided training and supervision, Korea Power Engineering Company Inc. prepared the documentation, and Korea Electric Power Corporation reviewed the draft reports. The Wolsong 2. 3. and 4 abnormal operating manuals have been successfully prepared and converted to Emergency Operating Procedures. The validation of the Emergency Operating Procedures via a simulator, is presently in progress at Wolsong site. The paper describes scope, response strategy to upsets and the hierarchy of the abnormal operating manuals. In addition, the structure of abnormal operating manuals is described.
机译:Wolsong 2、3和4是CANDU 6加压重水核电站,每个核电站的总电力输出为715MW(e)。这些植物于1990年代在大韩民国建造。三个Wolsong装置基于1983年宣布投入使用的先前的CANDU Wolsong装置1。所有四个装置目前都已投入商业使用。 Wolsong异常操作手册是在加拿大原子能有限公司,韩国电力工程公司的工作人员以及韩国电力公司的共同努力下制定的。加拿大原子能有限公司在进行风险评估研究和支持CANDU站以准备紧急操作程序方面的作用极大地适合了Wolsong异常操作手册程序。韩国电力公司提供了培训和监督,韩国电力工程公司准备了文档,韩国电力公司审查了报告草稿。狼歌2. 3.和4异常操作手册已成功编写,并转换为紧急操作程序。目前正在伍松现场通过模拟器验证紧急操作程序。本文描述了范围,对不正常情况的响应策略以及异常操作手册的层次结构。另外,还描述了异常操作手册的结构。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号