首页> 外文会议>5th IET International Conference on Renewable Power Generation 2016 >Assessment of the last-in-first out principle of access for managing the connection of distributed wind generators
【24h】

Assessment of the last-in-first out principle of access for managing the connection of distributed wind generators

机译:评估用于管理分布式风力发电机的连接的后进先出原则

获取原文
获取原文并翻译 | 示例

摘要

Recent projects in the UK have investigated different connection arrangements for managing distributed wind generators to maintain thermal limits and a number of principle of access for generators to the limited distribution network capacity have been investigated. However, principle of access to manage voltage limits have not received as much attention. This study aims to evaluate the current practice for connecting ‘non-firm’ distributed wind generators under both voltage and thermal constraint conditions. It addresses the issue by developing a representative model of a UK 11 kV radial distribution feeder comprising a mix of urban and rural sections using time-step optimal power flow simulations. The results indicated that when the principle is applied under both network constraint conditions, it can lead to inefficient use of network capacities and reduced renewable energy yields.
机译:英国最近的项目已经研究了用于管理分布式风力发电机以维持热极限的不同连接方式,并且研究了发电机进入有限配电网容量的多种原则。但是,管理电压限制的访问原则并未受到足够的重视。这项研究旨在评估在电压和热约束条件下连接“非公司”分布式风力发电机的当前做法。它通过使用时步最佳潮流模拟开发了英国11 kV径向配电馈线的代表模型来解决这个问题,该馈线包括城市和农村地区的混合。结果表明,在两种网络约束条件下应用该原理时,可能导致网络容量利用效率低下和可再生能源产量下降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号