首页> 外文OA文献 >Assessment of the last-in-first out principle of access for managing the connection of distributed wind generators
【2h】

Assessment of the last-in-first out principle of access for managing the connection of distributed wind generators

机译:评估用于管理分布式风力发电机的连接的后进先出原则

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Recent projects in the UK have investigated different connection arrangements for managing distributed wind generators to maintain thermal limits and a number of principle of access for generators to the limited distribution network capacity have been investigated. However, principle of access to manage voltage limits have not received as much attention. This study aims to evaluate the current practice for connecting ‘non-firm’ distributed wind generators under both voltage and thermal constraint conditions. It addresses the issue by developing a representative model of a UK 11kV radial distribution feeder comprising a mix of urban and rural sections using time-step optimal power flow simulations. The results indicated that when the principle is applied under both network constraint conditions, it can lead to inefficient use of network capacities and reduced renewable energy yields.
机译:英国最近的项目已经研究了用于管理分布式风力发电机以维持热极限的不同连接方式,并且研究了发电机进入有限配电网容量的多种原则。但是,管理电压限制的访问原则并未受到足够的重视。这项研究旨在评估在电压和热约束条件下连接“非公司”分布式风力发电机的当前做法。它通过使用时步最佳潮流模拟开发了英国11kV径向配电馈线的代表模型来解决这个问题,该馈线包括城市和农村地区的混合。结果表明,在两种网络约束条件下应用该原理时,可能导致网络容量利用效率低下和可再生能源产量下降。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号