首页> 外文会议>57th international water conference annual meeting >Getting the Lead Out! Operations at the Leadville Treatment Facility
【24h】

Getting the Lead Out! Operations at the Leadville Treatment Facility

机译:获得领先! Leadville治疗设施的运营

获取原文
获取原文并翻译 | 示例

摘要

The plant was designed/built to treat mine drainage to comply with EPA discharge limitations. Extensive pilot plant testing by independent Engineer preceded the plant design. Heavy metals are precipitated and removed as metal hydroxides using caustic soda. The plant uses the dense sludge process for precipitation and clarification. The dense sludge process minimizes chemical usage, reduces the foot print and eliminates separate thickener. The plant has been in continuous operation since 1991 and the treated effluent has always been in compliance with EPA limitations.
机译:该工厂的设计/建造旨在处理矿井排水,以符合EPA排放限制。在工厂设计之前,应由独立工程师进行广泛的中试工厂测试。重金属沉淀并使用苛性钠将其作为金属氢氧化物除去。该工厂使用浓污泥工艺进行沉淀和澄清。密集的污泥工艺可最大程度地减少化学药品的使用,减少占地面积并消除单独的增稠剂。该厂从1991年开始连续运行,处理后的废水一直符合EPA的规定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号