首页> 外文会议>55th ISA POWID symposium 2012. >Efficiency Increase of 1 in Coal-Fired Power Plants with Mathematical Optimization
【24h】

Efficiency Increase of 1 in Coal-Fired Power Plants with Mathematical Optimization

机译:通过数学优化,燃煤电厂的效率提高1%

获取原文
获取原文并翻译 | 示例

摘要

The entire process of a combined-heat-and-power (CHP) coal-fired power plant from coal delivery to electricity and heat generation can be modeled using machine learning methods that generate a single set of equations that describe the entire plant. The basis for the model is the historical data from the data historian. No engineering or human input is required. This model is used to compute the optimal operational point at any moment in time, taking into account the current status of the plant as well as relevant external and internal factors. The criterion for optimality is the overall equipment efficiency over the entire plant. This method requires no changes to be made to the plant and requires nominal human effort to implement. The achievements are based on operating changes that are computed. No human judgment is involved, thus the model excludes a potential bias or hu man error. Having a uniform operational strategy 24 hours a day combined with the fact that this model can incorporate the full complexity of the plant is the novel element that lies at the heart of the improvement possibility in the range of one percent. This has been demonstrated in the Reuter-West CHP plant of Vattenfall in Berlin, Germany.
机译:可以使用机器学习方法来建模热电联产(CHP)燃煤电厂从输煤到发电和供热的整个过程,该方法可以生成描述整个电厂的单组方程。该模型的基础是来自数据历史学家的历史数据。无需工程或人工输入。考虑到工厂的当前状态以及相关的外部和内部因素,该模型可用于随时计算最佳操作点。最佳标准是整个工厂的整体设备效率。此方法不需要对工厂进行任何更改,并且需要名义上的人力来实施。成就基于所计算的运营变化。由于没有人为判断,因此该模型排除了潜在的偏差或人为错误。每天24小时采用统一的运营策略,再加上该模型可以整合工厂的全部复杂性这一事实,是在1%范围内实现改进的核心要素。德国柏林Vattenfall的Reuter-West CHP工厂已证明了这一点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号