FIRST-TIME USE OF LDSAW X-80 PIPES FOR HIGH-PRESSURE AND HIGH-TEMPERATURE TRANSMISSION OF STEAM

机译:LDSAW X-80管道首次用于蒸汽的高温高压传输

获取原文
获取原文并翻译 | 示例

摘要

S In north-eastern Alberta/Canada, Canadian Natural Resources and others operate systems of steam transmission pipelines to deliver steam to hundreds of oil wells in Alberta. The delivered steam is injected into the well to stimulate the reservoir, enhancing the recovery of heavy oil. Due to changing stimulation techniques it was required to inject up to 3,000m~3 per day per well of cold water equivalent steam at a wellhead pressure of 13 MPa. Up to ten wells can receive steam simultaneously. To facilitate the economic movement of this large volume of steam, the installation of a 24NPS steam pipeline was essential and required the innovative application of existing technology. Another requirement was that the pipes must be field-weldable without post-weld heat treatment - a requirement aimed at keeping installation costs low. Several linepipe steel grades including grade X-80 and GRS 550 steels, which are comparable to CSA Gr. 550 steel, were examined for their mechanical properties up to 400℃. Based on this knowledge Europipe delivered the pipes for a steam pipeline of 4,500 m. The line of 24NPS CSA Gr. 550 material operates at a temperature of 354℃ and a pressure of 17.2 MPa. The elevated temperature tensile and CVN tests performed during the production of the 24NPS pipes confirmed the results of the preproduction tests of similar steels. Additionally, aging and creep tests with the original material were performed to determine a satisfactory lifetime at the given operating conditions. All tests established that the delivered material is suitable for the application. Also a field welding procedure was developed that did not require post weld heat treatment for the 24NPS CSA Gr. 550 pipes. The 4,500 m of 24NPS Gr. 550 linepipe were successfully installed and placed into service during the summer of 2001.
机译:S在加拿大艾伯塔省东北部,加拿大自然资源公司和其他公司经营着蒸汽传输管道系统,将蒸汽输送到艾伯塔省的数百口油井。输送的蒸汽被注入井中以刺激储层,从而提高了稠油的采收率。由于变化的增产技术,要求在井口压力为13 MPa的情况下,每口井每天最多注入3,000m〜3的冷水当量蒸汽。多达十口井可以同时接收蒸汽。为了促进大量蒸汽的经济流动,必须安装24NPS蒸汽管道,并且需要对现有技术进行创新应用。另一个要求是,管道必须在现场进行焊接,而无需进行焊后热处理-这项要求旨在降低安装成本。几种管线钢包括X-80和GRS 550钢,可与CSA Gr媲美。检查了550钢的最高400℃的机械性能。基于这些知识,Europipe为4,500 m的蒸汽管道交付了管道。 24NPS CSA Gr线。 550材料在354℃的温度和17.2 MPa的压力下工作。在生产24NPS管的过程中进行的高温拉伸和CVN测试证实了类似钢的预生产测试的结果。此外,还对原始材料进行了老化和蠕变测试,以确定在给定操作条件下的令人满意的使用寿命。所有测试均确定交付的材料适合该应用。还开发了一种不需要24NPS CSA Gr进行焊后热处理的现场焊接程序。 550个管道。 4,500 m的24NPS Gr。 550根管线已在2001年夏季成功安装并投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号