首页> 外文会议>34th Annual Conference of the Association of State Floodplain Managers 2010 >Garnett Regional Detention Facility: A Success Story in Managing NAI with Competing Interests
【24h】

Garnett Regional Detention Facility: A Success Story in Managing NAI with Competing Interests

机译:Garnett地区拘留所:在利益冲突中管理NAI的成功案例

获取原文
获取原文并翻译 | 示例

摘要

When considering the implementation of a regional detention pond to mitigate flooding, it is important to realize that reducing flooding is only one piece of the puzzle. From an engineering perspective, designing a pond to reduce flooding is the easiest part of the project, much like filling in the puzzle border. However, it takes many pieces to compete a puzzle. One critical piece is a comprehensive Master Drainage Plan to ensure that the pond fits within the overall plan to reduce flooding throughout the city. Another vital piece calls for coordination between city departments during early planning stages. Funding opportunities may come from developers, and local funding can often be leveraged with grant funds. Obtaining permits requires much more time than developing construction drawings, so this piece of the puzzle should be started as early as possible.
机译:在考虑实施区域性的蓄水池来减轻洪水时,重要的是要意识到减少洪水只是难题中的一个。从工程的角度来看,设计一个池塘以减少洪水是该项目最容易的部分,就像填充拼图边界一样。但是,要解决一个难题需要花费很多时间。一项重要的工作是全面的总排水计划,以确保池塘符合总体计划,以减少整个城市的洪水。另一个重要的内容是在规划的早期阶段,要求各城市部门之间进行协调。资金机会可能来自开发商,本地资金通常可以通过赠款资金来利用。获得许可证所需的时间比开发施工图所需的时间要多得多,因此,这一难题应尽早开始。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号