【24h】

Minimization of natural gas and water consumption in the operation of utility plants

机译:最大限度减少公用设施运营中的天然气和水消耗

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The main objective of this paper is to report reductions in water, natural gas consumption and operating cost obtained by choosing optimally the operating conditions of a real utility plant. There are continuos and discrete optimisation variables, therefore a Mixed Integer Non Linear Programming problem is solved with the code GAMS. The main continuous operating variables to be selected are temperature and pressure of the high, medium and low-pressure steam headers, de-aerator tank pressure and flow rates such us letdowns and vents. Binary variables are introduced for the selection of boilers, pumps and drivers. A rigorous simulation of the steam and power generation plant was developed interfacing a subroutine for water property prediction. The numerical results quantify the improvements that can be expected in the utility sector by selecting the continuos and discrete operating variables.
机译:本文的主要目的是报告通过最佳选择实际电厂的运行条件而减少的水,天然气消耗和运行成本。存在连续变量和离散优化变量,因此使用GAMS代码解决了混合整数非线性规划问题。要选择的主要连续运行变量是高压,中压和低压蒸汽总管的温度和压力,除气罐的压力和流量,例如泄压孔和排气孔。引入二进制变量以选择锅炉,泵和驱动器。开发了一个严格的蒸汽和发电设备仿真程序,该程序与用于水属性预测的子例程相接。数值结果通过选择连续变量和离散操作变量来量化公用事业领域可以预期的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号