Comparison of different dumping methods for breakwater construction

机译:防波堤施工中不同倾倒方法的比较

获取原文
获取原文并翻译 | 示例

摘要

Breakwaters are essential constructions in coastal engineering for the protection of coasts, human lives and infrastructure and are key components in port design. This contribution will focus on rubble mound breakwaters. There are different methods to construct rubble mound breakwaters by dumping rocks of varying rock size distribution. The choice of the construction method mainly depends on the local site conditions, that is the workflow of the construction. In general practice, a homogenous grain-size distribution of the breakwater core is assumed and the workflow of the construction is not considered. In this paper, three different methods of construction are compared, taking into consideration the actual heterogeneous grain-size distributions in the breakwater cores as well as the workflow of the construction. These three methods are: 1. Land-based construction by dump truck 2. Sea-borne construction by barges 3. Sea-borne construction with fall-pipes by barges The three methods have been examined intensively, experimentally and theoretically at the Department of Hydraulic Engineering, TU Berlin. The projects were granted by the German Research Foundation DFG. A large number of physical experiments were carried out on different scales with focus on the dumping process and on the resulting grain-size distribution in the structure's core. The falling behaviour of the rocks was investigated in a basin (1 m depth), a fall-tank (6 m depth) and a special facility with up to 20 m depth. The results were statistically analysed and compared with numerical simulations which were developed for these projects. Furthermore, the segregation of the rocks in the resulting rubble mound core was analysed and statistically evaluated. In this paper, the three methods are compared by discussing advantages and disadvantages. Finally, recommendations for designing and dimensioning breakwaters are given to improve the quality of future coastal structures.
机译:防波堤是海岸工程中保护海岸,人类生命和基础设施的必不可少的建筑,并且是港口设计的关键组成部分。这一贡献将集中在瓦砾堆防波堤上。通过倾倒各种岩石大小分布的岩石来建造瓦砾堆防波堤有不同的方法。施工方法的选择主要取决于当地的现场条件,即施工的工作流程。在一般实践中,假定防波堤芯的粒度分布均匀,并且不考虑施工的工作流程。考虑到防波堤芯中实际的非均质粒度分布以及施工流程,本文比较了三种不同的施工方法。这三种方法是:1.用自卸车进行陆上施工2.用驳船进行海上施工3.用驳船进行落水管进行海上施工液压方法对这三种方法进行了深入,实验和理论上的检验。柏林工业大学工程系。这些项目由德国研究基金会DFG资助。在不同的规模上进行了大量的物理实验,重点是倾倒过程以及结构核心中晶粒尺寸的分布。在一个盆地(1 m深度),一个落罐(6 m深度)和一个最大深度为20 m的特殊设施中研究了岩石的下落行为。对结果进行统计分析,并与针对这些项目开发的数值模拟进行比较。此外,分析并统计了所得瓦砾堆芯中岩石的偏析。本文通过讨论优缺点来比较这三种方法。最后,提出了防波堤的设计和尺寸建议,以提高未来沿海建筑的质量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号