Birmingham Bridge Rocker Bearing Failure and Retrofit

机译:伯明翰大桥摇臂轴承的故障和改造

获取原文
获取原文并翻译 | 示例

摘要

On February 8th, 2008 the steel expansion rocker bearings at Pier 10S failed, causing the steel plate girders to fall on the pier cap. Temporary shoring towers were installed to support the failed spans and relieve the load on the pier. A forensic investigation determined the cause of the rocker bearing failure, which changed how PENNDOT inspects expansion rocker bearings. Pier 10S was demolished and rebuilt, while Pier ION was retrofitted with new bearings and foundation.
机译:2008年2月8日,在10S墩处的钢膨胀门槛轴承失效,导致钢板大梁掉落在墩盖上。安装了临时支撑塔,以支撑失效的跨度并减轻码头的负荷。法医调查确定了摇臂轴承故障的原因,从而改变了PENNDOT检查膨胀式摇臂轴承的方式。 Pier 10S被拆除和重建,而Pier ION则使用新的轴承和基础进行了翻新。