On February 8th, 2008 the steel expansion rocker bearings at Pier 10S failed, causing the steel plate girders to fall on the pier cap. Temporary shoring towers were installed to support the failed spans and relieve the load on the pier. A forensic investigation determined the cause of the rocker bearing failure, which changed how PENNDOT inspects expansion rocker bearings. Pier 10S was demolished and rebuilt, while Pier ION was retrofitted with new bearings and foundation.
机译:2008年2月8日,码头10S的钢膨胀摇杆轴承失效,导致钢板梁落在码头上。临时支撑塔安装以支持失败的跨度并减轻码头上的负载。法医调查确定了摇杆轴承失效的原因,改变了Penndot如何检查扩展摇臂轴承。码头10S被拆除并重建,而码头离子有新的轴承和基础。